The office of the Village Engineer is responsible for plan review and construction oversight to ensure that public and private development improvements comply with Village standards, as well as County, State, and Federal regulations.
The Village Engineer also prepares construction plans, specifications, and contract documents for the construction of Village sewer, water, and roadway improvements, as well as handles inquiries regarding stormwater drainage and floodplain management, location of Village-owned utilities, right-of-way and property surveys, subdivision review, mapping services, Geographic Information Systems (GIS), and traffic studies. Field technicians with the Village Engineer’s office provide coordination between residents, contractors, and Village staff during construction projects.
Engineering Reports and Forms
- NPDES Annual Report
- Site Development Plan Checklist (Submit with application)
- Site Development Plan Requirements
- Permit Application Requirements and Procedures
- Tree Removal Permit Application
- Building Permit Application
- Fee Schedule
Engineering Standards
- Village Benchmark List
- Sample Site Development and Tree/Woodland Protection and Landscaping Plan
- Site Development Plan Requirements
- Site Plan Development Notes
- Special Considerations for properties Served by Low-Pressure Sanitary Sewer
- Woodland/Tree Protection Ordinance
- Ordinance on Automatic Fire Sprinklers
Engineering Details
- Asphalt Pavement Restoration Detail (pdf)
- Boundary Post Detail (pdf)
- Silt Fence Detail (pdf)
- Temporary Gravel Construction (pdf)
- Water Services Detail (pdf)
- Concrete Washout (pdf)
- Construction Sign (pdf)